Portal de San Pedro del Pinatar

www.portaldesanpedrodelpinatar.com

San Pedro del Pinatar - SpanishSan Pedro del Pinatar - English
detail of San Pedro del Pinatar

 

El Puerto de Lo Pagán expansion begins work on 138 berths (22/01/2015)

Two new docks, platforms and dredging of the dock to retrieve drafts, more señadas performances of a work that will import 1.2 million euros

The Minister of Development, Public Works and Planning, Francisco Barnabas, accompanied by the mayor of San Pedro del Pinatar, Visitation Martinez, made today the cornerstone of the redevelopment of the Port of Lo Pagan, which will, among other improvements , extension 138 of the berths available, 88 for nautical sports activities and the remaining 50 for fishing boats.

Barnabas stressed that this action requested by the Yacht Club de Lo Pagán, "is an extension of nautical sports facility motivated by the need to increase the number of berths and contribute to the removal of irregular anchorage of vessels that located in the vicinity of the sport dock, currently occupying an area of ​​approximately 80,000 square meters and endangering both the quality of the waters and the seabed ".

"At the same time, the works can help make the use of port facilities between the fishing dock and nautical-sports, dock while increase and improve operating conditions and safety first," explained the Minister of Development .

The Minister stressed the importance that the marine industry has in the region of Murcia, "especially equipped for its climate and its two seas to practice all kinds of nautical activities and sports", and highlighted the Government's willingness " to influence these aspects in order to realize the full potential that we have. "

For its part, the Mayor highlighted the benefits which will expand this infrastructure in the tourism and fisheries sectors, both of great importance in the town.

In this line, the counselor and the mayor also recalled that the City wants to launch a ferry line between La Manga and Lo Pagán, which will also help improve transport in the region and the development of tourism.

The port works Lo Pagan are budgeted at 1.2 million euros, and have a lead time of eight months.

They consist, among other interventions, recovery of drafts by dredging;

the construction of an inner dock, which will use a fishing inside and nautical sports on its outside side and an outer dock;

installation on the pontoons of separate platforms and docks waiting and loading and unloading;

execution services pontoons and mooring and anchoring elements.

Source: Ayuntamiento de San Pedro del Pinatar

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información