Portal de San Pedro del Pinatar

www.portaldesanpedrodelpinatar.com

San Pedro del Pinatar - SpanishSan Pedro del Pinatar - English
detail of San Pedro del Pinatar

 

A new full dock port facilities in San Pedro del Pinatar (20/04/2015)

The Amjomar dock represents an investment of over two million euros by the concessionaire and allows lifting large tonnage vessels.

The Minister of Development, Public Works and Planning, Francisco Barnabas, accompanied by the mayor of San Pedro del Pinatar, Visitation Martinez, today visited the works in the port town for the construction of a new dock, the execution and subsequent operation has granted the company Amjomar for a period of 27 years at an annual fee of 45,000 euros.

Bernabe said the new dock, located in the inner harbor basin between the Yacht Club Villa de San Pedro Waterfront and Marina Deportiva de las Salinas, next to Puerto Pesquero, "enriches port facilities with more than 600 moorings, shopping and entertainment and privileged enclave, which is undoubtedly a great attraction for sailing enthusiasts. "

For its part, the mayor praised the bravery of the pinatarenses entrepreneurs bet on their municipality with innovative initiatives like this that extends the nautical services of the town, placing it as a reference in the region and also involved the creation of 12 posts work.

The award was documented in March last year, and the works began in July with a budget of 2.1 million euros, over an area of ​​about 4,000 square meters, having generated 13 jobs.

The uses are directly related to and derived from the operations and functions of grounding, shoring, maintenance, repair, overhaul, painting, launch, exhibition of naval supplies, bilge suction / sanitary water, clean point and uses derivatives complementary needs of a slipway.

To access of vessels from sea to dry dock was built a moat which has installed a 160-ton travelift for lifting boats and earthing.

Then, move to the point of cleaning and washing, in front of the pit, where, after cleaning, a platform leads to the repair or placed in a position of grounding.

It has given the shipyard corresponding to the supply network for lighting, water, electricity and compressed air, fire protection, drainage and waste collection and recycling center in quiet area facilities and wastewater treatment.

It also has a dock with a ship prefabricated reinforced concrete structure with a floor area of ​​521 square meters and two separate areas for workshop and offices.

At the same time, distinguishes between spaces for the care of clients, reception and exhibition of items for sale, and workshops, an open to house boats and perform repair work on the same space.

Source: Ayuntamiento de San Pedro del Pinatar

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información